PROBLEMS & SOLUTIONS / CASE STUDY 001

The team had months.
I had ten days.

Rebuilding the mechanics behind City Scapes—a hinged platform that unfolds into one long, flat stage for an art piece.

FIFA WORLD CUP 2026SOFI STADIUMMECHANICAL REBUILD
City Scapes scenic assembly on its wheeled platform in the workshop
CITY SCAPES / WORKSHOP ASSEMBLY
Build already underway
3 months
Time to resolve it
10 days
Approximate platform weight
1,700 lb
Rebuilt drive layout
4 actuators / side — 8 total

01 / THE PROBLEM

A platform that needed
to do more than move.

The project was already three months into the build when I came in to rebuild its mechanical structure. The 30-foot center platform stays in place. An 18-inch connecting platform joins it to a 15-foot moving platform at each end. Each side uses four actuators to push and fold, folding inward over the top of the 30-foot fixed center platform to close and swinging outward to open into one long, flat presentation platform.

The original approach used one actuator and a locomotive-style push-pull linkage. I had ten days to resolve the mechanical problem and get the system working.

02 / SEE THE CHANGE

One drive. Then a different approach.

REBUILD / FOUR ACTUATORS ON EACH SIDEUNFOLDING
City Scapes platform: 30-foot center, 18-inch connectors, 15-foot endsA 30-foot fixed center platform, an 18-inch connector at each end, and two 15-foot moving end platforms. Four actuators on each side fold the outer platform inward over the fixed center or swing it outward to open. One actuator crosses the fixed-deck-to-connector hinge; the second is mounted to the connector and crosses the end-platform hinge. It starts two seconds after the first. The schematic shows representative actuator positions; the full rebuild uses four actuators on each side, eight total. SIDE VIEW / ACTUATORS AT BOTH HINGES 15 FT / LEFT PLATFORM15 FT / RIGHT PLATFORM 30 FT / FIXED CENTER PLATFORM18 IN / CONNECTOR18 IN / CONNECTOR A1: FIXED DECK → CONNECTOR / A2: CONNECTOR → END CITY SCAPES / ARTWORK SYMBOL TOP VIEW / SAME FOUR ACTUATORS

Cartoon effects for fun. Smoke and fire are simulated. Nothing actually caught fire. The actuators did fail, break apart, and come apart during the build; photos can document those real failures.

A1 · Fixed platform → 18″ connector · starts at 0 secondsA2 · 18″ connector → 15′ end · starts at +2 seconds

Stylized explanation based on my project account. The 30-foot center stays fixed while the two 15-foot end platforms, attached through 18-inch connectors, fold inward over the top of the center and open outward. Actuator clevis pins hinge directly on the steel triangle tips, following the workshop reference. The triangles rotate with the platforms they drive. The lower cylinder pivots from the fixed frame to the 18-inch connector triangle; the outer cylinder pivots from the connector to the 15-foot end triangle and starts two seconds later. The two-second start delay follows the actual sequence; overall travel duration, bracket geometry, clearances, mounting dimensions, and stroke lengths are illustrative; this is not a reconstruction of the exact mechanism. The original 18-inch actuator pivoted from the end of the fixed platform frame, using a smaller triangle to push the 15-foot platform. A locomotive-style arm occupied the opposite side where another actuator was needed. It moved only a few inches before getting hung up. The problem animation shows that short movement and binding; the exact mounting dimensions remain illustrative.

BEFORE / THE ORIGINAL APPROACH

One actuator, push-pull linkage.

The existing design tried to open the hinged platform through a locomotive-style system driven by a single actuator.

AFTER / MY REBUILD

Four actuators on each side.

I rebuilt the mechanical structure and changed the drive arrangement to four actuators on each side, eight actuators total. The actuators hinge directly on offset steel triangle tips, which rotate with their driven platforms. The first stage drives the 18-inch connector from the fixed frame. The second stage drives the 15-foot end from the connector, starting two seconds later.

03 / WHAT I CHANGED

Rebuild the structure.
Make the system work.

My solution replaced the original drive approach with four actuators on each side driving the 15-foot outer platforms, joined to the fixed 30-foot center through the 18-inch connectors. The platform weighed approximately 1,700 pounds, and the actuators were rated at 2,000 pounds each.

Getting there meant working through repeated actuator failures. The units purchased for the project were hobby-rated rather than intended for industrial use. The mechanical redesign was only part of the challenge; component reliability kept adding problems to an already tight deadline.

Those figures describe the reported platform weight and individual actuator ratings, not a calculated lifting capacity for the assembled system.

04 / UNDER THE DEADLINE

“The team had months. I had days and hours.”

Ten days to salvage a build already three months underway. I worked stretches of 20 and 30 hours to resolve the problems and get the platform working.

3 MONTHS INTO THE BUILD10 DAYS TO REBUILDA WORKING PLATFORM

05 / THE RESULT

A project brought
back to life.

I salvaged the project and created a working platform system for the FIFA 2026 opening at SoFi Stadium. The rebuilt mechanism unfolded into the long, flat platform needed to present City Scapes.

This is the work I want to show here: the problem I walked into, the decisions I made, and the build that came out the other side.